
Middle School #11 will be a new 128,000 sf middle school serving 5th & 6th grade students. The school is being built on an undeveloped site in a 100-year flood plain, with existing wetlands that could not be relocated. The project requires utilities and drainage infrastructure including off-site utility connections, storm water lift station, driveway and roadside improvements, and a detention pond.